Ethylene Industry ›› 2020, Vol. 32 ›› Issue (4): 39-42.

• INDUSTRIAL TECHNOLOGY • Previous Articles     Next Articles

Analysis on Processing Capacity and Effect of Double Caustic Wash Towers

Sui Ting   

  1. PetroChina Daqing Petrochemical Company, Daqing, Heilongjiang, P.C.163714
  • Received:2020-01-20 Revised:2020-09-01 Online:2020-12-25 Published:2021-01-04

Abstract:

Comparing the composition of light hydrocarbons with that of naphtha as the raw materials to a grassroots 600 kt/a ethylene plant, it was concluded that processing light hydrocarbons has obvious advantages in terms of product yield. Since the CO2 content of light hydrocarbons in oil fields exceeded the design processing capacity of the plant, a caustic wash tower was installed so that double caustic wash towers were used to achieve the dual purposes of enhancing the anti-CO2 interference capability and improving the light hydrocarbon processing capacity of the plant. After the implementation, the anti-CO2 interference capability was increased from 2000 mg/L to 4000 mg/L, the light hydrocarbon processing capacity was increased from 20,040 t/a to 430,162 t/a, and the caustic consumption per ton of light hydrocarbons was reduced from 163.87 kg to 13.70 kg.

Key words: double caustic wash towers, light hydrocarbon, carbon dioxide/CO2