Ethylene Industry ›› 2025, Vol. 37 ›› Issue (1): 31-33.

• INDUSTRIAL TECHNOLOGY • Previous Articles     Next Articles

Fault Analysis and Treatment of Solvent Pump in Butadiene Extraction Unit

Wang Jianfeng,Chen Gang,Gao Pengda,Zu Guoying,Liang Bo   

  1. PetroChina Dushanzi Petrochemical Company, Dushanzi, Xinjiang, P.C.833699
  • Received:2023-12-20 Revised:2024-10-28 Online:2025-03-25 Published:2025-04-01

Abstract:

The tower kettle pump of the cooling system in a butadiene extraction unit automatically shut down during normal operation. Through the analysis and study on the process operation status, sealing structure, material and lubrication of the pump, this paper finds out the reasons for the shutdown of the tower kettle pump of cooling system, and puts forward some effective improvement methods, thus prolonging the operation cycle of the pump and improving the continuity and stability of unit production.

Key words: NMP aqueous solution, fault analysis, measure