Ethylene Industry ›› 2023, Vol. 35 ›› Issue (3): 5-12.

• ENERGY CONSERVATION AND CONSUMPTION REDUCTION • Previous Articles     Next Articles

Fast Start-up Strategy of Ethylene Plant with Near Zero Emission

Jiang Pengfei, Hong Kun, Zhang Le, Shen Guangming, Zhao Cong   

  1.  PetroChina Dushanzi Petrochemical Company, Dushanzi, Xinjiang, P.C. 833699
  • Received:2022-01-04 Revised:2022-12-22 Online:2023-09-25 Published:2022-09-27

Abstract:

The optimization of the start-up process of ethylene plant is crucial to reducing flare emissions. Before the cracking furnace is fed, the nitrogen cycle of cracked gas compressor is used to start the pre-cooling of separation cold zone, and the temperature in cold box and demethanization system is reduced to -110~120℃. A new ethane cracking furnace is installed to increase the steam generation during the start-up, and the nitrogen pre-cooling is carried out at higher pressure, so that the outlet pressure of the cracked gas compressor can reach the allowable value of the feed to separation system without feeding materials. While the pre-cooling time is shortened, the time required for pressurizing the separation system is reduced, greatly reducing the flare emissions during the start-up.

Key words: ethylene plant, nitrogen precooling, near zero emission