Ethylene Industry ›› 2025, Vol. 37 ›› Issue (4): 60-64.
• OVERVIEW • Previous Articles
Gu Hongxing, Wan Jiachuan, Gu Yang, Ren Chongxin, Liu Po
Received:
Revised:
Online:
Published:
Abstract:
Key words: pipeline welding,  , lean construction,  , informatization,  , full process
Gu Hongxing, Wan Jiachuan, Gu Yang, Ren Chongxin, Liu Po. Construction and Application of 4D Pipeline Lean Construction Management System[J].Ethylene Industry, 2025, 37(4): 60-64.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://yxgy.sei.com.cn/EN/
http://yxgy.sei.com.cn/EN/Y2025/V37/I4/60
Analysis of Several Expense Issues Concerning Cost Plus Remuneration Model in Petrochemical Projects #br#
Discussion on Technology for Extracting n-Hexane from C6 Raffinate Oil
Performance Optimization of Database Optimizer Algorithms for Big Data
Application of A New Local Heat Treatment Method in High Pressure Threaded Ring Lock Heat Exchangers
Equipment and Piping Layout Design of Air Coolers in a Large-scale Petrochemical Plant
Layout Design and Numerical Simulation Analysis of Half-open Pipes at Inlet of Separators
Cited